38 years
Of collaboration
The Frito-Lay Lauzon factory is the first customer of Dinamo, built in 1987, the factory has contributed to the formation of our team.
Over the years, we have maintained a constant presence with this company by completing various mandates, ranging from major expansion of the Lévis facility to office renovation, Including roof upgrades and sector changes from 2014 to 2024, adding dock doors and reinforcing the existing structure for equipment installation.
Type of project :
Food Plant
Client
PEPSICO
Contractual method
Construction management
Our challenges during the project
The Frito-Lay factory in Lévis is one of only two factory in the Americas with a dedicated and certified contractor. In completing these multiple projects, Dinamo has faced several technical delivery challenges.
Dinamo offered a high level of flexibility in work execution and respecting the plant’s production downtimes.
01
Through in-depth analysis, Dinamo proposed innovative alternatives to meet budgetary constraints while maintaining the project’s quality standards.
02
Dinamo’s expertise allowed the work to be carried out in accordance with the applicable quality standards to maintain certification with PEPSICO.
The execution of the work meet the quality criteria required for a world-class plant.
03
Become a part of Dinamo! Build your future with us.
Explore the benefits of forging your career at Dinamo.